Search PubMed⌕ Search

PubMed · 14465521

Risk register.

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

R L LINDON. 1961. Risk register.. https://doi.org/10.1111/j.1469-8749.1961.tb10401.x

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

False positives in the prenatal ultrasound screening of fetal structural anomalies.

OBJECTIVE: To describe the false-positive diagnoses of prenatal ultrasound screening of fetal structural anomalies. METHODS: Pregnancies with fetal structural anomalies either detected prenatally in our center or referred to us, were registered, evaluated, and followed-up prospectively by a multidisciplinary Congenital Defects Committee. After postnatal follow-up was completed, cases were assigned as true positives, false positives or false negatives and categorized by anatomical systems. Pregnancies referred with a nonconfirmed suspicion of anomaly were not included. The false-positive diagnoses were analyzed. RESULTS: From 1994 to 2004, 903 new registry entries of fetuses structurally abnormal at ultrasound with a complete follow-up were included in the Committee database. There were 76 false positives, accounting for 9.3% of all the prenatally established diagnoses. The urinary tract anomalies were the most frequent false-positive diagnoses found (n = 25; accounting for 8.7% of the urinary tract defects), but the genital anomalies showed the higher rate of no confirmation (n = 5; 15.2%). The specific anomalies most commonly not confirmed were renal pyelectasis (n = 9), cerebral ventriculomegaly (n = 9), abdominal cysts (n = 7) and short limbs (n = 7). CONCLUSION: Several prenatally diagnosed anomalies would benefit from prudent counseling, because they may be normal variants or transient findings.

Congenital Abnormalities↗

New approaches to assessing the effects of mutagenic agents on the integrity of the human genome.

Heritable genetic alterations, although individually rare, have a substantial collective health impact. Approximately 20% of these are new mutations of unknown cause. Assessment of the effect of exposures to DNA damaging agents, i.e. mutagenic chemicals and radiations, on the integrity of the human genome and on the occurrence of genetic disease remains a daunting challenge. Recent insights may explain why previous examination of human exposures to ionizing radiation, as in Hiroshima and Nagasaki, failed to reveal heritable genetic effects. New opportunities to assess the heritable genetic damaging effects of environmental mutagens are afforded by: (1) integration of knowledge on the molecular nature of genetic disorders and the molecular effects of mutagens; (2) the development of more practical assays for germline mutagenesis; (3) the likely use of population-based genetic screening in personalized medicine.

Congenital Abnormalities↗