Search PubMedSearch

PubMed · 7880499

Critical pathways.

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

B J Gruendemann. 1994. Critical pathways.. https://pubmed.ncbi.nlm.nih.gov/7880499/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Community-level prevention of human immunodeficiency virus infection among high-risk populations: the AIDS Community Demonstration Projects.

The AIDS Community Demonstration Projects (ACDPs) were community-level human immunodeficiency virus-prevention programs targeting high-risk populations in five U.S. cities. For the intervention design, researchers developed a common study protocol based on behavior-change theories and models. This report describes the common study protocol used in the ACDPs, the preliminary findings, and the conclusions regarding the design, implementation, and evaluation of a community-level intervention; specific case studies from each project site are also described.

Clinical Protocols

Should obstetricians see women with normal pregnancies? A multicentre randomised controlled trial of routine antenatal care by general practitioners and midwives compared with shared care led by obstetricians.

OBJECTIVE: To compare routine antenatal care provided by general practitioners and midwives with obstetrician led shared care. DESIGN: Multicentre randomised controlled trial. SETTING: 51 general practices linked to nine Scottish maternity hospitals. SUBJECTS: 1765 women at low risk of antenatal complications. INTERVENTION: Routine antenatal care by general practitioners and midwives according to a care plan and protocols for managing complications. MAIN OUTCOME MEASURES: Comparisons of health service use, indicators of quality of care, and women's satisfaction. RESULTS: Continuity of care was improved for the general practitioner and midwife group as the number of carers was less (median 5 carers v 7 for shared care group, P<0.0001) and the number of routine visits reduced (10.9 v 11.7, P<0.0001). Fewer women in the general practitioner and midwife group had antenatal admissions (27% (222/834) v 32% (266/840), P<0.05), non-attendances (7% (57) v 11% (89), P<0.01) and daycare (12% (102) v 7% (139), P<0.05) but more were referred (49% (406) v 36% (305), P<0.0001). Rates of antenatal diagnoses did not differ except that fewer women in the general practitioner and midwife group had hypertensive disorders (pregnancy induced hypertension, 5% (37) v 8% (70), P<0.01) and fewer had labour induced (18% (149) v 24% (201), P<0.01). Few failures to comply with the care protocol occurred, but more Rhesus negative women in the general practitioner and midwife group did not have an appropriate antibody check (2.5% (20) v 0.4% (3), P<0.0001). Both groups expressed high satisfaction with care (68% (453/663) v 65% (430/656), P=0.5) and acceptability of allocated style of care (93% (618) v 94% (624), P=0.6). Access to hospital support before labour was similar (45% (302) v 48% (312) visited labour rooms before giving birth, P=0.6). CONCLUSION: Routine specialist visits for women initially at low risk of pregnancy complications offer little or no clinical or consumer benefit.

Clinical Protocols

The mouse that roared.

They don't call the onslaught of managed care a revolution for nothing: everything is different now. Especially communications technology. The key tasks of managed care, from identifying best practices to coordinating physicians, are impossible when relying on paper records alone. That's why more health systems are depending on automated medical records. Though it's still not too late to catch up to stay competitive, now could be your last chance.

Clinical Protocols