Search PubMed⌕ Search

PubMed · 7782379

Critical pathways in research.

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

C R Baxter. Critical pathways in research.. https://doi.org/10.1097/00004630-199503001-00011. https://searchpubmed.org/record/pubmed%3A7782379/critical-pathways-in-research

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search PubMed by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related citations

Comprehensive Analysis of Differentially Expressed Genes and Immune Infiltration in Burn Injury: Key Biomarkers and Pathways.

BACKGROUND: Burn injuries trigger complex immune responses and gene expression changes, impacting wound healing and systemic inflammation. Understanding these changes is crucial for identifying biomarkers and therapeutic targets. METHODS: We analyzed two gene expression omnibus datasets (wound tissue [GSE8056] and blood [GSE37069]) to identify differentially expressed genes (DEGs) in burn injury samples versus controls. Immune cell proportions were assessed using CIBERSORT. Functional enrichment analyses (Gene Ontology and Kyoto Encyclopedia of Genes and Genomes) and protein-protein interaction networks were constructed to identify key genes and pathways. RESULTS: We identified 1170 upregulated and 1227 downregulated DEGs. Gene Ontology analysis revealed enrichment in neutrophil activation, inflammatory response, and extracellular matrix organization. Kyoto Encyclopedia of Genes and Genomes analysis highlighted cytokine-cytokine receptor interaction, TNF, and IL-17 signaling pathways. Immune infiltration analysis showed significant changes in neutrophils, macrophages (M1/M2), and T-cell subsets. Protein-protein interaction network analysis identified five hub genes: JUN, STAT1, Bcl2, MMP9, and TLR2. CONCLUSIONS: This study provides a comprehensive bioinformatic analysis of gene expression and immune responses in burn injuries. The identified DEGs, hub genes, and pathways offer insights into the immune response mechanisms and suggest potential targets for diagnostic and therapeutic interventions in burn injury management.

Burns↗

Blood transfusions are associated with increased risk for development of sepsis in severely burned pediatric patients.

OBJECTIVE: To determine the risk of developing sepsis following transfusion of blood products in severely burned pediatric patients. DESIGN: Retrospective, cohort study. SETTING: Shriners Hospital for Children and University Hospital. PATIENTS: Severely burned pediatric patients with >30% total body surface area (TBSA) burn. INTERVENTIONS: None. MEASUREMENTS AND MAIN RESULTS: Two hundred seventy-seven pediatric burn patients over a period of 7 yrs (1997-2004) were included in the study, with 25 patients being septic at admission and therefore excluded. Patients were stratified according to TBSA burn and presence or absence of inhalation injury. The amounts of packed red blood cells (RBCs) and fresh frozen plasma (FFP) were recorded during hospital stay before the development of sepsis. Blood product administration was normalized for the number of surgeries and divided into two groups: high (RBCs>20/FFP>5) or low (RBCs<20/FFP<5) amount of blood products. Sepsis was diagnosed based on the criteria set by the Society of Critical Care Medicine in conjunction with positive blood culture or presence of organisms in the organs at autopsy. By stratifying the groups into low and high blood transfusion, we found that patients with >60% TBSA burn with inhalation injury have an 8% risk of developing sepsis in the low RBC group, which increases to 58% in the high RBC group (p<.05). Similar results were found for RBCs per operation, FFP, and FFP per operation (p<.05). There were no differences in age and gender between groups. CONCLUSIONS: Pediatric burn suffering from a 60% TBSA burn with concomitant inhalation injury are more likely to develop sepsis if they are given high amounts of blood products, indicating an immunocompromised state following blood transfusion.

Burns↗