Search PubMed⌕ Search

PubMed · 5195215

[Child-at-risk Register].

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

T Marstein. 1969-09-01. [Child-at-risk Register].. https://pubmed.ncbi.nlm.nih.gov/5195215/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Effect of multiple interventions on community health workers' adherence to clinical guidelines in Siaya district, Kenya.

Evaluation of a community health worker (CHW) programme in Siaya district, Kenya, showed CHWs commonly made errors in managing childhood illness. We assessed the effect of multiple interventions on CHW healthcare practices. A sample of 192 ill-child consultations performed by 114 CHWs in a hospital outpatient department between February and March 2001 were analysed. The mean percentage of assessment, classification and treatment procedures performed correctly for each child was 79.8% (range 13.3-100%). Of the 187 children who required at least one treatment or referral to a health facility, only 38.8% were prescribed all treatments (including referral) recommended by the guidelines. Multivariate analyses found no evidence that the intervention-related factors studied (refresher training, supervision, involvement of community women in the CHW selection process, adequacy of medicine supplies, and use of a guideline flipchart during consultations) were significantly associated with overall or treatment-specific guideline adherence. A multivariate linear regression analysis revealed that several non-intervention-related factors, such as patient characteristics, were significantly associated with overall guideline adherence. Given that our study was cross-sectional and our measurement of exposure to several interventions was based on CHW recall, the estimated effects of the interventions should be interpreted with caution. Despite these limitations, however, our results raise questions about the effectiveness, in the setting of Siaya district, of several interventions commonly used to improve the quality of care given by CHWs.

Child Health Services↗

Could nutritional rehabilitation at home complement or replace centre-based therapeutic feeding programmes for severe malnutrition?

To measure the success rate of three different strategies used in Médecins Sans Frontières large-scale therapeutic nutritional rehabilitation programme in Niger, we analysed three cohorts of severely malnourished patients in terms of daily weight gain, length of stay, recovery, case fatality and defaulting. A total of 1937 children aged 6-59 months were followed prospectively from 15 August 2002 to 21 October 2003. For the three cohorts, 660 children were maintained in the therapeutic feeding centre (TFC) during the entire treatment, 937 children were initially treated at the TFC and completed treatment at home and 340 children were exclusively treated at home. For all cohorts, average time in the programme and average weight gain met the international standards (30-40 days, >8 g/kg/day). Default rates were 28.1, 16.8 and 5.6% for TFC only, TFC plus home-based and home-based alone strategies, respectively. The overall case fatality rate for the entire programme was 6.8%. Case fatality rates were 18.9% for TFC only and 1.7% for home-based alone. No deaths were recorded in children transferred to rehabilitation at home. This study suggests that satisfactory results for the treatment of severe malnutrition can be achieved using a combination of home and hospital-based strategies.

Child Health Services↗