Search PubMed⌕ Search

PubMed · 1729903

Upgrading practice with critical pathways.

Abstract

The source did not provide an abstract. Follow the original record for more information.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

C Mosher, P Cronk, A Kidd, P McCormick, S Stockton, C Sulla. 1992. Upgrading practice with critical pathways.. https://searchpubmed.org/record/pubmed%3A1729903/upgrading-practice-with-critical-pathways

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search PubMed by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related citations

[Retained foreign bodies from the view of the OR nurse].

Patient safety in the operating room is of high priority for the surgical team and for all healthcare workers involved. Counting procedures contribute to minimizing potential risks for the patients, especially in preventing them from leaving the operating room with retained, unintended foreign bodies. A total of 64% of operating room nurses involved in a survey are reported as having been involved in a surgical procedure in which the correct count prevented foreign bodies from being left in the patient. In addition, the strengths and potential weak points of the counting procedures could be identified. The results of the survey and drafts for a standard counting control as well as procedural recommendations are presented for discussion. A recommendation can be provided for each surgical department in order to check their own counting methods for avoiding potential risks.

Documentation↗