Search PubMed⌕ Search

PubMed · 10461506

Protocols and critical pathways for stroke care.

Abstract

We have presented a conceptual approach toward developing clinical protocols and critical pathways in a complex multidisciplinary environment with a commitment to clinical excellence, evidence-based practice methodology, and education. The process and the mood surrounding these have been more important in our view than any particular protocol or pathway. They have generated an attitude aiming toward avoidance of complications rather than crisis management. They have contributed to a philosophy of integrative multidisciplinary collaborations among various specialists, house staff, and nursing and paramedical personnel and a greater mutual sensitivity in interactions with medical center management and administration. The overall impact of this global approach has been quantifiable (Fig. 6), although the role(s) of one or more facets of it cannot be independently defined (21, 22). Protocols and clinical pathways should be viewed as components of total quality management. They should not be allowed to restrict the patient's or physician's choice of interventions, they should not inhibit in any way innovation or the introduction of novel methodologies. Yet, protocols and critical pathways should and do generate a pressure on every member of the health-care team, a sense of negative entropy constantly urging a move toward a higher level of excellence and quality.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

I A Awad, P Fayad, S I Abdulrauf. 1999. Protocols and critical pathways for stroke care.. https://pubmed.ncbi.nlm.nih.gov/10461506/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Genetically predicted on-statin LDL response is associated with higher intracerebral haemorrhage risk.

Statins lower low-density lipoprotein cholesterol and are widely used for the prevention of atherosclerotic cardiovascular disease. Whether statin-induced low-density lipoprotein reduction increases risk of intracerebral haemorrhage has been debated for almost two decades. Here, we explored whether genetically predicted on-statin low-density lipoprotein response is associated with intracerebral haemorrhage risk using Mendelian randomization. Using genomic data from randomized trials, we derived a polygenic score from 35 single nucleotide polymorphisms of on-statin low-density lipoprotein response and tested it in the population-based UK Biobank. We extracted statin drug and dose information from primary care data on a subset of 225 195 UK Biobank participants covering a period of 29 years. We validated the effects of the genetic score on longitudinal low-density lipoprotein measurements with generalized mixed models and explored associations with incident intracerebral haemorrhage using Cox regression analysis. Statins were prescribed at least once to 75 973 (31%) of the study participants (mean 57 years, 55% females). Among statin users, mean low-density lipoprotein decreased by 3.45 mg/dl per year [95% confidence interval (CI): (-3.47, -3.42)] over follow-up. A higher genetic score of statin response [1 standard deviation (SD) increment] was associated with significant additional reductions in low-density lipoprotein levels [-0.05 mg/dl per year, (-0.07, -0.02)], showed concordant lipidomic effects on other lipid traits as statin use and was associated with a lower risk for incident myocardial infarction [hazard ratio per SD increment 0.98 95% CI (0.96, 0.99)] and peripheral artery disease [hazard ratio per SD increment 0.93 95% CI (0.87, 0.99)]. Over a 11-year follow-up period, a higher genetically predicted statin response among statin users was associated with higher intracerebral haemorrhage risk in a model adjusting for statin dose [hazard ratio per SD increment 1.16, 95% CI (1.05, 1.28)]. On the contrary, there was no association with intracerebral haemorrhage risk among statin non-users (P = 0.89). These results provide further support for the hypothesis that statin-induced low-density lipoprotein reduction may be causally associated with intracerebral haemorrhage risk. While the net benefit of statins for preventing vascular disease is well-established, these results provide insights about the personalized response to statin intake and the role of pharmacological low-density lipoprotein lowering in the pathogenesis of intracerebral haemorrhage.

Cerebral Hemorrhage↗

Visual development in infants with prenatal post-haemorrhagic ventricular dilatation.

OBJECTIVE: The aim of this study was to assess visual function in 13 infants with evidence of prenatal post haemorrhagic ventricular dilatation. DESIGN: Infants were assessed at 5, 12 and 24 months using a battery of tests specifically designed to assess various aspects of visual function in infancy. Visual findings were correlated with several variables, including extent of the lesion and presence of epilepsy. RESULTS AND CONCLUSIONS: Abnormalities of visual function were frequent (over 60%) in our cohort at age 2 years, ranging from isolated abnormal ocular movements to severe abnormalities of all the aspects of visual function assessed. The most severe and persistent abnormalities of visual function were found in infants with grade IV intraventricular haemorrhage and shunted hydrocephalus who also had epilepsy in the first year.

Cerebral Hemorrhage↗