Search PubMed⌕ Search

PubMed · 10162539

A prodigious information systems failure.

Abstract

The article reports a case study in the conception and implementation of a regional information systems project in a Regional Health Authority in England in the 1980s. The project was technically ambitious and involved far-reaching organizational changes throughout the region. The project failed, after considerable expenditure, because support in the region dwindled. With reference to the context of changing management practice in the National Health Service in the 1980s, the project is assessed in the light of its technocratic focus and its effects on the organization, including implicit changes in power relationships.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

M Bourn, C A Davies. 1996. A prodigious information systems failure.. https://pubmed.ncbi.nlm.nih.gov/10162539/

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related citations

Tip cooling effect and failure mechanism of field-emitting carbon nanotubes.

The cooling effect accompanying field electron emission has been considered for a single carbon nanotube (CNT) used as a field emission (FE) electron source. An improved model for the failure mechanism of field emitting CNTs has been proposed and validated. Our model predicts a maximum temperature (T-max) located at an interior point rather than the tip of the CNTs, and the failure of the CNT emitters tends to take place at the T-max point, inducing a segment by segment breakdown process. A combination of Joule heating and electrostatic force effect is proposed responsible for initiating the failure of the field emitting CNT and validated by in situ FE observation.

Equipment Failure↗

[Importance of an initial check-up for diagnostic radiology apparatus management].

The management of apparatus for diagnostic imaging is an important job for radiological technologists. In the last 10 years we have encountered 2227 malfunctions in 3652 days. We detected 163 cases at the initial check-up, which accounted for 7.3% of total cases. By performing an initial check-up, we detected one malfunction every 21 days and were able to keep the effects of mishaps to a minimum, prevent accidents, and obtain stable-quality images.

Equipment Failure↗